Project Details

Plant120Nm3/hr Water Electrolysis Hydrogen Generating Plant
ClientWax Hydrogenation Plant
LocationZGV Svisloch, Belarus
Nominal Capacity120Nm3/hr
Purity99.99%
Feed StockD.M. Water
Electricity10kV and 400V
Start-up DateJan., 2016 (Estimated)

EAC Certificates

Installation and commissioning of this Water Electrolysis Hydrogen Generating Plant was carried out by KAPSOM’s team since Nov., 2015. KAPSOM is the contractor for the hydrogen generating plant.

wax-hydrogenation-plant

The Wax Hydrogenation Plant in Minsk, Belarus

The installation was done under the supervision of KAPSOM’s engineers. It’s required by the end user to apply for EAC certificates as per local regulations, TP TC 010/2011, On the safety of machinery and equipment; TR CU 004/2011 On safety of low-voltage equipment and TR TC 032/2013, On the safety equipment of high pressure.

hydrogen-generating-plant

hydrogen-generating-plant-2

120Nm3/hr 99.99% Hydrogen Generating Plant

With the assistence of the EPC Contractor and the Belarusian end user, mecahnical installation and electrical installation were carried out as per local regulation. Documents were prepared as per local CU TR authority’s requirements.

eac-certificate

EAC Certificates for KAPSOM’s Hydrogen Generating Unit